facades > partitions > suspended ceilings > fire protection > dry lining > plastering

Smithy Wood Sheffield

The Smithy Wood development was part of a regeneration programme on the old colliery site.

The development included two storey medium sized industrial and open plan office units.

The main structures were steel framed portal frames, with a mixture of brickwork, panelling and rain screen to form the facades.

Our scope of works included: dot and dab to blockwork areas, MF ceilings and grid suspended ceilings by AMF ceilings, to the open plan offices and communal areas.

Rollover the images below to view more: -

Smithy Wood Sheffield.

Main Contractor: ISG Totty
Client: Saint Paul's Developments
Package Value: £220,000
Programme: June 2007 - December 2007